PDI 7.41% 25.0¢ predictive discovery limited

5 years is the time frame to build the infrastructure and to...

  1. 27,466 Posts.
    lightbulb Created with Sketch. 1781
    5 years is the time frame to build the infrastructure and to start mining. We will be rewarded after the MRE upgrade, further drilling results, indicative JORC, DFS/PFS and then ML.
 
watchlist Created with Sketch. Add PDI (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.