The likely continuation of the main reef through trenching has really highlighted the potential of the Peco project. The dimensions of these multiple reefs are estimated to be 2m and 8m, extending over 100, with the depth of
cover approx. 1.2m. I cannot wait for the JORC compliant resource definition. I just hope that l can jackpot more oppies today.
==============================================
As is quoted in the Quarterly Report:
The top of a smaller possible reef structure may have been exposed as well. Widths of these manganese reefs were 2m and 8m, extending over 100, with the depth of
cover approx. 1.2m.
The likely continuation of the main reef through trenching has...
Add to My Watchlist
What is My Watchlist?