The report was prepared on a PC called dmcentaggart. They seem to generate the updates on this computer so I assume it is a standard report that they just keep adding to. This report was also generated yesterday at 12pm. Maybe Brazil time. The best reports come from a PC called G53. I would expect a report on the drilling progress between 7-10 trading days.
This report looks very good and am happy that the lab was able to produce results for 12-24 inline with their estimates.
- Forums
- ASX - By Stock
- pedra upgrade
The report was prepared on a PC called dmcentaggart. They seem...
-
- There are more pages in this discussion • 49 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit