From the last qrtly
Peelwood (base metals, NSW/Australia – 100%)
Sultan continues to work through the EIS (Environmental Impact Study) for the Peelwood Project with a targeted completion by the end of 2011. The Company has engaged a very capable Project Manager for this process and does not expect any major issues; however, it is a process that takes time to address each and every detail. Sultan is aiming to have this project ready for production by early 2012 with a view to ascertaining the best option for plant construction thereafter and, ultimately, mining this asset
- Forums
- ASX - By Stock
- peelwood
From the last qrtlyPeelwood (base metals, NSW/Australia –...
-
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NVA
Nova locks in NASDAQ US market listing at a value of only US$3.3M as ASX gets quieter and quieter
IGO
IGO kicks off earn-in copper drilling on-site Encounter's Yeneena play as it adopts new identity