The contractor lined the RA-24 part of the basin with Bauxsol and rock on May 19th.
PennDOT has directed the drilling contractor for the Bauxsol to install two more monitoring wells in the fill near structure 317. Contractor completed the drilling for the two new wells as of 5-17. This work began May 16th.
VTI hase not verified any of this info.. so are we as shareholders expected to beleive this is all b/S(*t?
it's a shame VTI dont spend as much time on Shareholder updates as the do spending their incentives.
The contractor lined the RA-24 part of the basin with Bauxsol...
Add to My Watchlist
What is My Watchlist?