AIM 1.23% 80.0¢ ai-media technologies limited

perkoa update annmnt, page-2

  1. 13,575 Posts.
    lightbulb Created with Sketch. 567
    Nice to see some project detail with good piccies of this detail as well.

    I see they are shotcreting the highwall for stability.Looks like they might need to do same on the left side of the box cut next to the portal.Material looks quite loose.But Im sure SL's got this well in hand.

    Hope the pump-out pits go good capacity as there must be quite a bit of catchment within the box cut.Interesting how one almost needs a hydrologist to work out something as simple as a pump-out rate for these box cut sumps.Nothings ever easy.

    The actual timing of concentrate production may work out OK given that its quite possible the market MAY be moving back to deficit into 2010.

    Still much to see completed on the finance side but at least this will give potential lenders some idea that stuff is being done.

    Good to see they are investigating the ore body at depth too.Cross the digits for some decent results here.

    d.

 
watchlist Created with Sketch. Add AIM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.