GGP 0.00% 0.6¢ golden gate petroleum ltd

6 November 2012Permian Project Update – SRH 5H Well Commences...

  1. 2,367 Posts.
    6 November 2012
    Permian Project Update – SRH 5H Well Commences Drilling
    Operations
    Golden Gate Petroleum Ltd (ASX: GGP) (“Golden Gate” or the “Company”) is pleased to
    provide an operational update on activities in our Permian Project, Texas, USA.
    VALLEY No 1 WELL DRILLING DATE
    Permian Project, Reagan and Irion Counties, Texas, Operator 100% WI SRH
    #5H Well
    The SRH #5H well, Golden Gate’s first horizontal well commenced drilling operations at
    3.30pm, 5 November 2012 US Central time. The Western Drilling Rig No. 6 is currently
    drilling ahead. It will take approximately three (3) weeks to drill the horizontal well. The
    well plan calls for a full suite of electric logs to be run in order to assist with the planning
    process for the fracture stimulation program.
    The horizontal interval to be drilled is the Wolfcamp A interval. We believe there are three
    and possibly four intervals which could be candidates for horizontal drilling over our
    leasehold position. Approximately 24 horizontal well locations have been identified for each
    interval. 72 to 92 horizontal wells in total could be drilled over the leasehold.
    Based on other horizontal well estimates by major operators in the area, the SRH # 5H well
    could have an estimated ultimate resource potential of approximately 400,000 barrels of oil
    equivalent made up of primarily oil and gas liquids.
    The current plan is to drill Wolfcamp horizontal wells over the leasehold position in 2013 in
    order to maintain all leases via the continuous drilling requirements. The SRH #5H well will
    provide important information for next year’s drilling program as well as being a producing
    well.
    Besides Wolfcamp horizontal wells in the Permian, GGP plans to participate in the Eagle
    Ford Project where we have a 10% working interest over 3,400 acres. Horizontal Eagle Ford
    shale wells are to be drilled and completed over the same time. Both projects will be
    subject to financial capabilities.
    Part of the on-going legal dispute with Petro-Raider, LLC (“PR”) over the Permian leasehold
    position, a complaint has been filed with the Texas Railroad Commission challenging our
    drilling permit for the SRH #5H. We believe PR’s claims are without merit and will
    vigorously defend against this challenge.
    For further information contact:
 
watchlist Created with Sketch. Add GGP (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.