Hi Topwon
Thanks for your reply.
"The current optimized BFS does not use the "M" farm as part of it's infrastructure."
Is your claim above contained somewhere 'offical' (did i miss it in an announcement somewhere?) or have you made your own additional enquiries?
Is the TSF to be located in one the other non-preferred locations or is the plan to convey or more likely slurry pipeline the ore elsewhere for treatment? I expect a JV and slurry pipeline to existing facilities may make sense.
Thanks in advance :)
Ben
- Forums
- ASX - By Stock
- permission to build on maandagshoek farm
Hi TopwonThanks for your reply."The current optimized BFS does...
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)