oops Have a typo in my postThe actual cost to bring the pre-salt fields on line is 400billion not 400million. But the figure of $35 a barrel remains the sameSorry about that Cheers
TMG Trigg brings famed Finnish metals refiner – and its tech – onboard to bolster antimony processing