http://www.asx.com.au/asx/statistics/showAnnouncementPDF.do?idsID=00835255
Mining underway and buyers lining up, its a great position to be in.
Current Market Cap 304,862,547 x 0.07 = $21,340,378.29
Upper bentonite total = 7,590,000 Tonnes
Lower bentonite total = 7,425,000 Tonnes
Total = 15,015,000 Tonnes
Dried unprocessed bentonite costs = $120-$150/Tonne
Accumulative mining and transport costs = $73.25
15,015,000 Tonnes x (120-73.25) = $701,951,250
15,015,000 Tonnes x (150-73.25) = $1,152,401,250
The bentonite resource alone is worth between:
$0.7 - 1 BILLION
Yes, the MC is 1/50th the value of this particular resource. The presentation also highlights Sodium Bicarbonate and Dolomite projects also....
- Forums
- ASX - By Stock
- PEV
- pev presentation calculations
pev presentation calculations
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PEV (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.5¢ |
Change
-0.300(7.89%) |
Mkt cap ! n/a |
Open | High | Low | Value | Volume |
3.9¢ | 3.9¢ | 3.4¢ | $156.9K | 4.327M |