As the next big announcement is the PFS, it is worth considering what to expect.
The Scoping Study variables included:
-480k T/pa throughput
-569k ounces gold produced
-POG $AUD2,450
- Total revenue $1.394b
During recent presentations RR has indicated a 750k T/pa plant. If we assume that the 50%+ plant expansion Vs the Scoping Study results in as little as a 25% uplift in production in the PFS compared to the Scoping Study we can arrive at something like:
PFS
-711k ounces gold produced
-POG $AUD3,300
- Total revenue $AUD2.346bn
No matter how conservative you are in assessing the prospective numbers, the PFS numbers are going to be materially better than the Scoping Study metrics. An additional $1b in LOM revenue provides a considerable amount of cash flow to fund additional capex and operating costs.
- Forums
- ASX - By Stock
- RXL
- PFS Metrics
PFS Metrics
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RXL (ASX) to my watchlist
|
|||||
Last
13.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $56.98M |
Open | High | Low | Value | Volume |
13.5¢ | 14.0¢ | 13.5¢ | $4.393K | 32.16K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
9 | 494161 | 13.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
14.0¢ | 468530 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
9 | 494161 | 0.135 |
5 | 186699 | 0.130 |
3 | 126518 | 0.125 |
1 | 5000 | 0.120 |
1 | 8704 | 0.115 |
Price($) | Vol. | No. |
---|---|---|
0.140 | 468530 | 6 |
0.145 | 80086 | 1 |
0.150 | 93687 | 6 |
0.155 | 76667 | 2 |
0.160 | 146473 | 2 |
Last trade - 11.04am 19/06/2024 (20 minute delay) ? |
Featured News
RXL (ASX) Chart |
The Watchlist
SS1
SUN SILVER LIMITED
Gerard O'Donovan, Executive Director
Gerard O'Donovan
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online