Well, todays report said over the next 24 hours we can look forward to:
"reduce mud weight, RIH, ream and wash hole, prepare to sidetrack the well... the sidetrack well will be named LUMBA LUMBA-1A-ST1"
..does that mean "...dont look like there is much here...now lets drill this way" ?