SAME STORY EVERY YEAR.CTR anticipates commercial production at...

  1. 534 Posts.
    lightbulb Created with Sketch. 9
    SAME STORY EVERY YEAR.

    CTR anticipates commercial production at Hell's Kitchen to begin in 2024.

    https://www.bakertilly.com/insights/builds-foundation-to-align-esg-strategy

    Colwell said Controlled Thermal Resources aims to start producing 25,000 tons of battery-grade lithium products a year by 2025.https://www.pressenterprise.com/2023/04/28/electric-vehicle-boom-could-turn-salton-sea-into-americas-lithium-valley/#:~:text=To%20stay%20ahead%20of%20the,products%20a%20year%20by%202025.

    Companies look to 2026 for mass lithium production
    https://kesq.com/salton-sea/2024/09/05/white-gold-rush-companies-look-to-2026-for-mass-lithium-production-near-salton-sea/
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.