Next Steps are; 1. De Scaling/Blockage removal of wells.2. Local...

  1. 434 Posts.
    lightbulb Created with Sketch. 9
    Next Steps are;

    1. De Scaling/Blockage removal of wells.
    2. Local permit approval to flow existing wells.
    3. Flow testing wells for ~14 days in order to obtain data for JORC.
    4. Add updated data to JORC model and review.

    We still don't have permit approval.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.