Next Steps are;
1. De Scaling/Blockage removal of wells.
2. Local permit approval to flow existing wells.
3. Flow testing wells for ~14 days in order to obtain data for JORC.
4. Add updated data to JORC model and review.
We still don't have permit approval.
- Forums
- IPOs
- Phoenix Water - PXW - Lithium - 100x
Next Steps are; 1. De Scaling/Blockage removal of wells.2. Local...
-
- There are more pages in this discussion • 1,681 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)