The PDR, which is the 750km main road up Cape York and mainly dirt was closed to HV's for three months this year which is an exceptionally long period. This area has up to 400mm a month.
https://www.timeanddate.com/weather/@2171097/climate
Whether or not the road is passable depends mainly on the road base (hard gravel, clay, black dirt) or flooding. And the flooding areas are the low flat lying areas (obviously). Sections of the PDR can go under by 10m or more. No pushing through that.
Is the big scary wet a problem? Possibly, possibly not.
- Forums
- ASX - By Stock
- Phone conversation with Scott - 5th July 2023.
The PDR, which is the 750km main road up Cape York and mainly...
-
- There are more pages in this discussion • 50 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $96.41M |
Open | High | Low | Value | Volume |
6.9¢ | 7.0¢ | 6.7¢ | $110.9K | 1.634M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 50725 | 6.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.8¢ | 68393 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 50725 | 0.067 |
8 | 258024 | 0.066 |
3 | 783384 | 0.065 |
3 | 129202 | 0.064 |
5 | 960900 | 0.063 |
Price($) | Vol. | No. |
---|---|---|
0.068 | 68393 | 1 |
0.069 | 82736 | 2 |
0.070 | 74981 | 1 |
0.071 | 99434 | 1 |
0.072 | 180000 | 2 |
Last trade - 16.10pm 10/07/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online