IVZ 1.49% 6.8¢ invictus energy ltd

Final TD for the well will depend on:- amount of drill pipe on...

  1. 3,706 Posts.
    lightbulb Created with Sketch. 2852
    Final TD for the well will depend on:

    - amount of drill pipe on site. Most of the slimhole work Ive done required 3-1/2" drill pipe for lower section of the drill string.
    - whether or not they hit a water contact. If a contact is intersected they'll drill far enough past it to get coverage with logging tools.
    - what they consider a safe length of hole to have open for a barefoot test if that is what they have planned.

    Not sure what will happen with testing plans if the intersect a water contact. Ideally you'd want to isolate the water leg for a test.
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
(20min delay)
Last
6.8¢
Change
0.001(1.49%)
Mkt cap ! $96.41M
Open High Low Value Volume
6.7¢ 6.9¢ 6.7¢ $34.82K 512.0K

Buyers (Bids)

No. Vol. Price($)
2 150899 6.8¢
 

Sellers (Offers)

Price($) Vol. No.
6.9¢ 131225 1
View Market Depth
Last trade - 16.10pm 12/07/2024 (20 minute delay) ?
IVZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.