IVZ invictus energy ltd

Phone conversation with Scott - Jan 12th 2023., page-268

  1. 895 Posts.
    lightbulb Created with Sketch. 401
    "The only time you would need stim/fracking for a flow test is if you know from the start that you'll he trying to flow tight sections".

    Actually, as Butcherano's recent posts highlighted, there are field cases such as Dongara where the reservoir permeability is not the sole cause of an inability to flow. Dongara may have been affected by near wellbore formation damage due to incompatible completion fluid/drilling mud (high skin factor adversely affects the ability to flow). Another possibility is they opened the well too quickly or there was too much drawdown (choke size too large) and that created a condensate bank around the well which blocked the flow of gas. Dongara is an example of a reservoir which should have been capable of flow because it's permeability was high enough, but either formation damage or too much condensate dropout may have led to the failure.

    Invictus may face a similar situation in some of the Upper Angwa sands. It's best to open up wells carefully and not decrease the BHP too much by beaning up to too large a choke size. I therefore highly recommend having hydraulic frac equipment and/or Stimguns/Stimtube onsite for M-2ST well testing as back up in the event that a zone fails to flow.


    Last edited by Grfe4: 21/01/24
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
4.9¢
Change
-0.001(2.00%)
Mkt cap ! $78.57M
Open High Low Value Volume
5.0¢ 5.1¢ 4.9¢ $68.60K 1.373M

Buyers (Bids)

No. Vol. Price($)
7 506027 4.9¢
 

Sellers (Offers)

Price($) Vol. No.
5.0¢ 59290 1
View Market Depth
Last trade - 16.10pm 24/06/2025 (20 minute delay) ?
IVZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.