from Dec 2007 news reports
"Ma'aden , the Saudi Arabian Mining Co. awarded $630 million final contracts separately to two Chinese and Korean firms for the construction of power and desalination as well as beneficiation plants"
"Construction on the beneficiation plant at Al-Jalamid will commence in April 2008, with completion expected by May 2010"
"Work at the Ras Az Zawr site has already begun with the driving of piles for the sulphuric acid plant and started basic construction of foundations"
So they have only just started on all this
- 5Mt mine
- beneficiation plant
- 140 MW power generator
- 10GL/yr desalination plant
- sulfuric acid plant
- ammonia plant
- 3 birth panamax port
- 1400km railway
At the same time they'll be building a massive aluminium mine and smelter.
If they can build all this in 4 years (ie by 2012) it will be very impressive - 2010, they're dreamin'
- Forums
- ASX - By Stock
- phosphate supply
from Dec 2007 news reports"Ma'aden , the Saudi Arabian Mining...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AEV (ASX) to my watchlist
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $21.14M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AEV (ASX) Chart |
Day chart unavailable