AEV 0.00% 0.4¢ avenira limited

The main raw material bottleneck for LFP expansion is expected...

  1. 562 Posts.
    lightbulb Created with Sketch. 104
    The main raw material bottleneck for LFP expansion is expected to be in battery-suitable PPA, which is derived from mined phosphorus rock, with Benchmark predicting 0.8 million tonne deficit in the chemical worldwide by 2030.
    https://hotcopper.com.au/data/attachments/6323/6323559-573528d1daefa680a1735c4d4c1d1285.jpg
    https://hotcopper.com.au/data/attachments/6323/6323562-cce1dcca46242480d9d1c036958d36ad.jpg
    https://hotcopper.com.au/data/attachments/6323/6323565-d7c596b03095135da4070944819ffb9f.jpg
 
watchlist Created with Sketch. Add AEV (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $9.396M
Open High Low Value Volume
0.4¢ 0.5¢ 0.4¢ $5 1.124K

Buyers (Bids)

No. Vol. Price($)
22 19698265 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 1110491 3
View Market Depth
Last trade - 16.10pm 19/07/2024 (20 minute delay) ?
AEV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.