Cameron-26 pilot well completed and extended production testing now underway.
• The well is being production tested at a flow rate of 750 mcf/day with no associated water production. The controlled rate represents a surface drawdown of only 12% and corresponds to a wellhead AOF of over 3 MMSCF/day at current conditions.
can anyone tell me what does "wellhead AOF of over 3 MMSCF/day at current conditions." - i think it must be good?
- Forums
- ASX - By Stock
- PES
- pilot well big production - asx announcement
PES
pepper residential securities trust no. 21
pilot well big production - asx announcement
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)