The results from this test are very promising.
It is behaving at this stage similiar to a conventional gas play both in terms of flow rates and the lack of water content.
Usually with CSM one must draw down the water to allow the gas to pass through the coal seam to be extracted. This can take several months and water disposal/treatment is a cost to the operation. This is very typical of QGC wells.
- Forums
- ASX - By Stock
- pilot well big production - asx announcement
PES
pepper residential securities trust no. 21
The results from this test are very promising.It is behaving at...
-
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)