When the board decided to realign the company divesting it of non-core assets and doubling down on Mongolian gas, it seems they knew someone else would be paying for capex from pipelines to rail to power stations.
With the Power of Siberia pipeline 1 launched and plans for number 2 underway, there is talk of building even more pipelines and power stations from Russia and Siberia through the Mongolian capital and past Elixir’s tenement.
Once Elixir confirm they are sitting on a massive gas deposit, National players will be bidding for Elixir shares. Elixir will sell out at a massive upside to what will already be a .50 cent shareprice and the rest will be history.
How long for Elixir to establish a contingent resource? Two short months and the clock is ticking.
http://jargaldefacto.com/article/the-economics-of-natural-gas-favor-mongolia
- Forums
- ASX - By Stock
- EXR
- Pipe Dreams in Mongolia
Pipe Dreams in Mongolia
-
-
- There are more pages in this discussion • 66 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EXR (ASX) to my watchlist
(20min delay)
|
|||||
Last
15.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $179.5M |
Open | High | Low | Value | Volume |
15.5¢ | 15.8¢ | 15.0¢ | $464.2K | 3.044M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 350583 | 15.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
15.5¢ | 220882 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 330583 | 0.150 |
10 | 874234 | 0.145 |
11 | 1027860 | 0.140 |
17 | 1312016 | 0.135 |
19 | 1297545 | 0.130 |
Price($) | Vol. | No. |
---|---|---|
0.155 | 195882 | 3 |
0.160 | 398577 | 9 |
0.165 | 380000 | 6 |
0.170 | 222276 | 6 |
0.175 | 142732 | 8 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
EXR (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online