Townsville has two pipes from Mt Spec dam but I've never heard of anyone suggesting putting generators in them. I'd assume that's because the capital cost is too high and because the water is more valuable than the power and as discussed turbines reduce water flow.
- Forums
- General
- Pipe in the power Portland
Pipe in the power Portland, page-9
Featured News
Featured News
The Watchlist
P.HOTC
HotCopper
Frazer Bourchier, Director, President and CEO
Frazer Bourchier
Director, President and CEO
SPONSORED BY The Market Online