Following on from its recently announced approval for developing Braemar 4 power station, ERM Power has lodged application to build a 204 km pipeline from the Goondiwindi gas fields north towards Tara, to supply the plant.
Note that this is proposed to be a 'bi-directional' line enabling gas from the Surat Basin to be piped south at a later date.
I haven't checked my figures lately, but at 550Mw I think Braemar is one of EPW's largest built.
Rgds,
Lilac
EPW Price at posting:
$1.50 Sentiment: Hold Disclosure: Held