"Just a thought about BHP, why dosnt BRM offer BHP $500 million toward building their full loop track for unlimited access, this would be paid for with 50 million tonnes of FE + production costs".
Great idea GS - a "win-win" situation all-round.
- BHP gets 50mt of free ore to sell and builds a second track from the profits (with heaps of profit left over),
- BRM still has more than enough ore (enough for 48 years instead of 50),
- BRM gets transport infrastructure in place, and
- BHP doesn't need to worry about bottlenecks or break-downs on its' rail line.
Why not send this idea to WR (mind you, he may be working on something like this already).
- Forums
- ASX - By Stock
- BRM
- placement
placement, page-6
-
- There are more pages in this discussion • 28 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)