Even if BHP is the first bid, we dont necessarily need FMG to come over the top with a scrip bid.
How about:
(1) CRM agree to build a rail line to FMG (their contribution to a JV with UMC.)
(2) FMG grant access to their rail on commercial terms.
Over time this option gives us at least a minimum $5 shareprice.
- Forums
- ASX - By Stock
- plan b
Even if BHP is the first bid, we dont necessarily need FMG to...
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add UMC (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online