COE 0.00% 21.5¢ cooper energy limited

Plan B, page-21

  1. 6,565 Posts.
    lightbulb Created with Sketch. 150
    Average processing rate for May was 55.77 which was 36% higher than Apr 22. Production is growing.

    Exert from announcement
    "At OGPP the average processing rate for May was 55.7 TJ/d, 36% higher than the average April processing rate of 41TJ/d. OGPP performed at or above 60TJ/d for 21 days during May, with a maximum rate of 66 TJ/d achieved. The OGPP processing rate was reduced to 36.4TJ/d on average during absorber cleans for 8 days in May".
    Last edited by taboon: 20/06/22
 
watchlist Created with Sketch. Add COE (ASX) to my watchlist
(20min delay)
Last
21.5¢
Change
0.000(0.00%)
Mkt cap ! $567.6M
Open High Low Value Volume
21.0¢ 22.0¢ 20.5¢ $770.0K 3.609M

Buyers (Bids)

No. Vol. Price($)
6 391296 21.0¢
 

Sellers (Offers)

Price($) Vol. No.
22.0¢ 618989 10
View Market Depth
Last trade - 16.10pm 16/07/2024 (20 minute delay) ?
COE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.