the point is that
So4 does not have EPA aproval to produce and sell
200 000 tpa or native title aproval for that matter
the 50 000 tpa that can be produced is for demonstration
purposes only
any extension on 50 000 ton will require EPA aproval
and that will take 2/3 years
add in the risk of uranium contamination And it may never happen
there is two uranium mines either side of the deposit
so for the sake of clarity
investors are getting taken for a ride IMO
Add to My Watchlist
What is My Watchlist?