FMS are still drilling area E and are yet to drill the remaining four areas which may harbour shallower mineralization than area E IMO.
Going on the experience of HAW and JMS, assays may take up to 4-6 weeks.
Just BTW the UMC railway deposit, although high grade in parts, seems to be mostly (>75%) between 50-150m in depth with some high grade near surface areas (>10m depth).
Add to My Watchlist
What is My Watchlist?