@ panda7
Let´s make numbers to check your claim.
Sounds fair?
Check out the presentation from May 11 2021 slide 15.
PLS mineral resource 223 Mt
ALO mineral resource 46 MT
Total combined: 269 MT
That excludes the possible increase from the drilling of the sterilized boundary area between PLS and former ALO. Resource update announced for Sep 2021 (Ann from 23.06.2021)
Stage 2 Pilgan + Ngungaju = 680tpa spodumene
Ore mined to spodumene roughly 9:1 (check last annual report ore mined 812.000t, concentrate produced 90.000t)
That means PLS needs to mine 9 x 680.000t ~ 6.000.000 t of ore
Life of mine at that production rate = 269Mt / 6 MT = 45 years
So your claim is plain false. And the resource increase from the tenement boundary is going to add a few years extra.
Discl: Very long PLS .... and very happy with it. (Sold roughly 1/3 on the way up between @0,91, @1,16 @1,28 and @1.56. remaining position is free carry)..
- Forums
- ASX - By Stock
- PLS chart
@ panda7Let´s make numbers to check your claim. Sounds...
-
-
- There are more pages in this discussion • 20,336 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PLS (ASX) to my watchlist
|
|||||
Last
$3.15 |
Change
0.040(1.29%) |
Mkt cap ! $9.480B |
Open | High | Low | Value | Volume |
$3.16 | $3.18 | $3.12 | $71.90M | 22.82M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 112482 | $3.15 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$3.16 | 320783 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 112482 | 3.150 |
15 | 795252 | 3.140 |
22 | 650733 | 3.130 |
16 | 399061 | 3.120 |
19 | 228658 | 3.110 |
Price($) | Vol. | No. |
---|---|---|
3.160 | 52088 | 4 |
3.170 | 389922 | 23 |
3.180 | 278041 | 19 |
3.190 | 280016 | 15 |
3.200 | 233011 | 29 |
Last trade - 16.10pm 25/06/2024 (20 minute delay) ? |
Featured News
PLS (ASX) Chart |