PLS 1.64% $3.00 pilbara minerals limited

Lowest production cost due to economy of scale. But what of the...

  1. 374 Posts.
    Lowest production cost due to economy of scale. But what of the capital outlay required to achieve this economy of scale? Plant is not cheap to build. A high throughput plant is not going to be cheap to build. Low cost production comes at a price.

    Trying to eliminate any debts once brine operators have kneecapped the commodity price is a precarious position.
    Last edited by Ravenhaller: 16/09/16
 
watchlist Created with Sketch. Add PLS (ASX) to my watchlist
(20min delay)
Last
$3.00
Change
-0.050(1.64%)
Mkt cap ! $9.029B
Open High Low Value Volume
$3.03 $3.06 $3.00 $41.07M 13.59M

Buyers (Bids)

No. Vol. Price($)
97 622937 $3.00
 

Sellers (Offers)

Price($) Vol. No.
$3.01 580 1
View Market Depth
Last trade - 16.10pm 05/07/2024 (20 minute delay) ?
PLS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.