Talking to the Study Manager at the recent shareholders meeting, I asked more or less the same questions as above and was told that all long lead items were being designed and constructed for a 4mpta plant and then the final production plant was being designed for a 2mpta (Train 1), so that additional capacity could be added by the use of an additional Train (ie 4mpta -Train 2), without affecting any production.
- Forums
- ASX - By Stock
- PLS long lead items question ?
Talking to the Study Manager at the recent shareholders meeting,...
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PLS (ASX) to my watchlist
(20min delay)
|
|||||
Last
$2.69 |
Change
-0.100(3.58%) |
Mkt cap ! $8.100B |
Open | High | Low | Value | Volume |
$2.76 | $2.76 | $2.64 | $113.9M | 42.48M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
22 | 171620 | $2.68 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.69 | 87000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
21 | 171247 | 2.680 |
15 | 628752 | 2.670 |
36 | 427060 | 2.660 |
77 | 288959 | 2.650 |
71 | 439642 | 2.640 |
Price($) | Vol. | No. |
---|---|---|
2.690 | 87000 | 2 |
2.700 | 49919 | 2 |
2.710 | 288424 | 9 |
2.720 | 700050 | 11 |
2.730 | 280742 | 3 |
Last trade - 16.10pm 16/10/2024 (20 minute delay) ? |
Featured News
PLS (ASX) Chart |
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online