PLS 1.32% $2.98 pilbara minerals limited

A big winner if a Li2SO4 plant is built in Port Hedland could be...

  1. 1,029 Posts.
    lightbulb Created with Sketch. 541
    A big winner if a Li2SO4 plant is built in Port Hedland could be LPD I surmise. They identified some years back that the conventional flowsheet for Li2SO4 to LCE produced Na2SO4 as a by product. The market for Na2SO4 is mature, it cannot be dumped due it’s water solubility so is costly to get rid of.
    They have a patent process that has a better carbon footprint, 5% saving capex and opex against the conventional flowsheet for the production of LCE. They have demonstrated this process of late with a number of spod producers.
 
watchlist Created with Sketch. Add PLS (ASX) to my watchlist
(20min delay)
Last
$2.98
Change
-0.040(1.32%)
Mkt cap ! $8.969B
Open High Low Value Volume
$3.01 $3.01 $2.95 $52.16M 17.48M

Buyers (Bids)

No. Vol. Price($)
1 167 $2.98
 

Sellers (Offers)

Price($) Vol. No.
$2.99 53875 10
View Market Depth
Last trade - 16.10pm 18/07/2024 (20 minute delay) ?
PLS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.