data available on the internet specifically for Canberra gives an average daily output for a 1Kw panel of 3.76KwHrs/day on a year round basis.
Other data also suggests that the time to recover the manufacture through to installation footprint would be about 10 years average. 15 months would be the bare panel at the factory door. As with many things, transport, handling, installation etc. are hugely variable and can make the original cost of the item insignificant, especially items that have to be imported.
- Forums
- Political Debate
- pm has ace up the sleeve
data available on the internet specifically for Canberra gives...
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
NUZ
NEURIZON THERAPEUTICS LIMITED
Michael Thurn, CEO & MD
Michael Thurn
CEO & MD
SPONSORED BY The Market Online