BML 4.76% 10.0¢ boab metals limited

PMY - SILVER INVESTORS DREAM at start of BULL RUN, page-9

  1. 13,344 Posts.
    lightbulb Created with Sketch. 2510
    So using @goldbear77 weighted average metal price over the next 2-3 years. Ag $60 US and Pb $1.10 lb. And using my calculations only.

    The share price target moves up to 15c. That is 10X this mornings opening share price. This value is for the existing SORBY HILLS project component the subject of the upcoming Optimised PFS only and only adds $20 Million for exploration upside.

    There is still therefore very limited value placed on the value of Ag and Pb that will still be in the ground and to be found by infill, expansion drilling and exploration.

    https://hotcopper.com.au/data/attachments/2345/2345836-dc9c4efac37700f67a3e1567b2ed79bf.jpg
    https://hotcopper.com.au/data/attachments/2345/2345840-b6d95d686b220e3dbefbc1acbe86895b.jpg

    https://hotcopper.com.au/threads/more-than-10x-ten-times-current-share-price.5388385/page-933?post_id=46234546%EF%BB%BF%EF%BB%BF

 
watchlist Created with Sketch. Add BML (ASX) to my watchlist
(20min delay)
Last
10.0¢
Change
-0.005(4.76%)
Mkt cap ! $18.34M
Open High Low Value Volume
10.5¢ 11.0¢ 10.0¢ $88.21K 837.2K

Buyers (Bids)

No. Vol. Price($)
5 139085 10.0¢
 

Sellers (Offers)

Price($) Vol. No.
10.5¢ 117991 3
View Market Depth
Last trade - 16.10pm 10/05/2024 (20 minute delay) ?
Last
10.5¢
  Change
-0.005 ( 0.00 %)
Open High Low Volume
10.8¢ 11.0¢ 10.0¢ 499994
Last updated 15.53pm 10/05/2024 ?
BML (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.