NVA 2.70% 19.0¢ nova minerals limited

POG, page-240

  1. 5,768 Posts.
    lightbulb Created with Sketch. 1405
    The bottom halves of the South downhill holes made me doubt a full South-Valley connection, but it's a big area that remains undrilled - so there still could be something.

    https://hotcopper.com.au/data/attachments/5819/5819144-688d3e4ea76fae4ff2954378a663f140.jpg



    The Vrify website is new to me, and it's good. So I don't have to check the Nova website, but can check there?

    North Uphill results were released 11 Dec with screenshots of the 3D model. I'm not seeing any December updates on Vrify, so I guess they have it set to private now.

    There's a slide with project-wide surface samples (possibly rock chips and soil samples muddled together).

    https://hotcopper.com.au/data/attachments/5819/5819112-1b691635147d363373d8e90ad06a2c76.jpg
    https://hotcopper.com.au/data/attachments/5819/5819158-45cc4e602a1407edc13f74fdb135b6a4.jpg

    - RPM Area - likely highest priority for PFS.
    - Train Area (Trumpet, Train, Muddy Creek, Shoeshine) - likely highest priority for exploration. Uphill pad now demands a Further Uphill pad. Valley results might demand more pads too.
    - Cathedral seems to have something, but the drilling missed it. Just not sure how it'll get prioritised if a Korbel plant was later in any mining plan.

    They have a view with US Gold.

    https://hotcopper.com.au/data/attachments/5819/5819178-69e229807640373ba4f2e1b307753f28.jpg

    I found how to turn on drilling and rock chips together.

    South - looks worth testing uphill (which was already necessary).

    https://hotcopper.com.au/data/attachments/5819/5819186-64c35c48c98b21b732a11b1100e2283e.jpg


    Uphill pad was from an area of strong rock chips. So hard to say how much further uphill the gold will trend.
    https://hotcopper.com.au/data/attachments/5819/5819193-5f5b6201d7238537712d8f087f733033.jpg

    Gamble Hole barely got very far into the colour anomaly. Not close to the high grade rock chip.
    https://hotcopper.com.au/data/attachments/5819/5819206-693fdac9e06f5f1cb749327d88f6ccfb.jpg

    Found the top secret Train drilling. (below ground view) 1 long hole showing nothing in that direction (direction is deep under the mountain, away from Trumpet). The short holes were less terrible, but there's overall not much data from that pad. Not many holes, and not many meters. With such continuous surface samples, I'd imagine they need holes in every direction to see where it leads. My preference may be at Trumpet, and with antimony assaying (but also at Train).

    https://hotcopper.com.au/data/attachments/5819/5819213-51ee582a67d168d844159b98847c5858.jpg


    Cathedral underground view. Seems to get a bit better in the shallows towards the rock chips. But it's still way deep, and Korbel has like 100 comparable holes. So the grade needs to be the same or better to the top of the mountain.

    https://hotcopper.com.au/data/attachments/5819/5819250-6d580c44455fc9e5a63665c6d36dda42.jpg

    These are the grades that get ignored at Korbel (Cathedral might potentially be better) -

    https://hotcopper.com.au/data/attachments/5819/5819258-7566dd63d75bca64bd4eeaab44d929e4.jpg





    Here's another dream case (which is actually following the ridge line). Uphill pad is showing good results along that trend. Surface samples do not provide evidence of it continuing further, but the pad itself is showing quite consistent assays.

    https://hotcopper.com.au/data/attachments/5819/5819107-f64a385feefbdca2b0fb5678cf82bf0d.jpg
    https://hotcopper.com.au/data/attachments/5819/5819130-3ba14efb5328670c3dc4f8ae0ffd55be.jpg


    Current inferred does not extend far in that direction. Uphill pad is going to make it extend somewhat further with the new MRE update.
    https://hotcopper.com.au/data/attachments/5819/5819135-4a6ed50dcd62d1cb05146807aa905eb4.jpg

 
watchlist Created with Sketch. Add NVA (ASX) to my watchlist
(20min delay)
Last
19.0¢
Change
0.005(2.70%)
Mkt cap ! $40.86M
Open High Low Value Volume
18.0¢ 19.0¢ 17.8¢ $63.16K 346.9K

Buyers (Bids)

No. Vol. Price($)
1 7633 18.0¢
 

Sellers (Offers)

Price($) Vol. No.
19.0¢ 93561 1
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
NVA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.