PEN 4.55% 11.5¢ peninsula energy limited

positive signs of things to come , page-13

  1. 13,234 Posts.
    lightbulb Created with Sketch. 555
    Licencing process is simply too long and too cumbersome and goes through continuous changes.

    (URZ submitted its license application to NRC 2007 and still waiting ). It is totally ridiculous and some times not even worth trying. I believe URZ project life is 5 years and they have been waiting since 2007 for licence.

    I understand that PEN can;t do anything except keep trying to accelerate the process.

    "I have a practical, risk free idea to accelerate licencing process. Within one year everything will be cleared. It has worked in past and it will work again."
 
watchlist Created with Sketch. Add PEN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.