Am abit surprised that LMG aren't utilising the conveyor / storage bin structure at the old BCLV site on the Nth side of the LMG site.
It has a lot of under / unutilised industrial equipment inc distributed HV power supply, dust suppression, truck unloading, materials handling etc.
Last I heard they were doing H2 related stuff but unsure if that's still an active situation.
Hoping we will find out about status of funding drawdown tomorrow and update on the awarding of contracts.
- Forums
- ASX - By Stock
- POSSIBLE NEWS between LMG and battery plant
Am abit surprised that LMG aren't utilising the conveyor /...
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LMG (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.2¢ |
Change
0.001(3.23%) |
Mkt cap ! $75.15M |
Open | High | Low | Value | Volume |
3.2¢ | 3.2¢ | 3.1¢ | $6.057K | 192.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 21491 | 3.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.2¢ | 340055 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 7989 | 0.031 |
12 | 1086643 | 0.030 |
6 | 672551 | 0.029 |
4 | 1500000 | 0.028 |
1 | 7000 | 0.027 |
Price($) | Vol. | No. |
---|---|---|
0.032 | 340055 | 1 |
0.033 | 200000 | 1 |
0.035 | 9836 | 1 |
0.036 | 186679 | 4 |
0.037 | 6000 | 1 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
LMG (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online