Extracted from an article about gold mining in Vietnam:
Although open pit mines can be profitable with a gold grade of 3-4g per tonne, 10-12g per tonne is considered good for an underground mine.
As ours will be an open pit mine (excavator, bulldozer and trucks) with an initial average grade of 12.3g/t things are looking extremely good.