Share
2,531 Posts.
lightbulb Created with Sketch. 122
clock Created with Sketch.
25/08/17
02:10
Share
Originally posted by nbbirch
↑
Its been staring us all in the face the whole time, it just clicked with me.
Hole 1 will be around 250.75m of mineralisation imo. Not sure about the grade but I expect similar to hole 2.
The hole ended at 311.5m and they changed their bit from PQ to HQ at 38.75m, they do this as they either encounter harder rock or pegmatite. They have been drilling on average 20m past mineralisation to see if their was anything further then terminated the hole so we can safely assume the pegmatite finished at 290-292m. If you look at the cross section picture of hole 1 in the latest presentation, mineralisation started from very early on like hole 2, so i assume they changed their bit when they hit pegmatite.
Doing the math gives us max pegmatite of 251m. Unless the cross section is made up which i doubt as it shows three very thin sections of pegmatite before they hit the main body this hole wil take the record.
Hole 7 will have a max mineralisation of 283.7m but as they have not released a cross section of it it is hard to determine how much is pegmatite and how much is mica schist.
Expand
Roger that from Ho Chi Min...awaiting multiple World Record status announcements..
Mekong Whiskey is within reach!
Lithium Investor code name Anush-HCM is ready to party.
AVZ You have a green light for Go!!