The grades here actually aren't too bad imo. You can't compare directly with solution mining, its a very different process. In the case of a lake brine, the potash is already in solution and is evaporated to precipitate (or otherwise separate) the potash salt (in this case likely to be SOP - potassium sulphate, or perhaps a mineral containing magnesium, sulphur and potassium). With solution mining water is injected to first dissolve the potash salt (MOP or potassium chloride) and then it is brought to the surface to evaporate. The capex requirements of the two are also very different.
The location of the lake with respect to infrastructure gives them something of an advantage over RWD's WA projects at Lake Mackay and Lake Disappointment. I would buy a few on spec but the <0.5c share price is a bit of a turn off (how did it get there?), as are the gripes about management.
- Forums
- ASX - By Stock
- JRV
- potash ??? at lake barlee
potash ??? at lake barlee, page-22
-
-
- There are more pages in this discussion • 23 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
Add JRV (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.3¢ |
Change
-0.001(7.14%) |
Mkt cap ! $35.13M |
Open | High | Low | Value | Volume |
1.4¢ | 1.4¢ | 1.3¢ | $26.41K | 2.001M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 110948 | 1.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.4¢ | 1655283 | 10 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 110948 | 0.013 |
17 | 7099198 | 0.012 |
17 | 4556694 | 0.011 |
28 | 13317561 | 0.010 |
11 | 4010236 | 0.009 |
Price($) | Vol. | No. |
---|---|---|
0.014 | 1155283 | 9 |
0.015 | 1473283 | 5 |
0.016 | 1675372 | 8 |
0.017 | 1137766 | 5 |
0.018 | 2599433 | 5 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
JRV (ASX) Chart |