to my limited knowledge, potash is sold in 50% concentrate
ELM, based on historical drilling, first hole now confirmed, targeting 170m to 300mt of 23% potash
production @ 1.2mtpa
mine life must be at least 50 years
240mtpa x 23% / 1.2mtpa = 46 years at 100% potash
to my limited knowledge, potash is sold in 50% concentrateELM,...
Add to My Watchlist
What is My Watchlist?