they've messed around with Iron Ore in the past which didn't bring home the bacon.
are they on the right train this time..????
POTASH: Paradox Basin Potash Project covers approximately 89,000 acres in the Paradox Basin in South Eastern Utah strategically located close to existing road and rail infrastructure. The project is located approximately 10km south of Intrepid Potashs Cane Creek potash mine. The Paradox Basin Potash Project comprises potash mineralisation in two beds of interest, Potash 13 and Potash
18.
The overall exploration target range for the two Potash beds is approximately 2.5 to 3.8Bn tonnes of sylvinite at an average grade of 19 to 28% KCl (12 to 18% K2O).
one thing i would say "i like some of the people involved in this company", follow the money.
volume is pretty inconsistent & low at times.
might be worth chalking down.
weekly chart.![]()
they've messed around with Iron Ore in the past which didn't...
Add to My Watchlist
What is My Watchlist?