INR 0.00% 13.5¢ ioneer ltd

Ioneer are guiding 2 year’s for plant construction commencing...

  1. 122 Posts.
    lightbulb Created with Sketch. 24
    Ioneer are guiding 2 year’s for plant construction commencing from FID which they expect in Q124. So on that basis first production would be in 2.5 years.
 
watchlist Created with Sketch. Add INR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.