Over the weekend the 17-1/2” hole section was drilled to planned depth at 2072.7mTVDBRT. The geology of the intermediate section was assessed via the Logging While Drilling tools and all formation tops were in accordance with pre-drill predictions. This illustrates the excellent quality seismic data and demonstrates consistency with the near-by Mentorc-1 and Mentorc-2 discoveries.
- Forums
- ASX - By Stock
- PRM
- Potential 150 Bagger
Potential 150 Bagger, page-211
-
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PRM (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $1.945M |
Open | High | Low | Value | Volume |
0.5¢ | 0.5¢ | 0.5¢ | $156 | 31.27K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 5995225 | 0.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.6¢ | 1430478 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 5995225 | 0.005 |
7 | 2127272 | 0.004 |
4 | 3176675 | 0.003 |
6 | 2800009 | 0.002 |
9 | 8301091 | 0.001 |
Price($) | Vol. | No. |
---|---|---|
0.006 | 1430478 | 1 |
0.007 | 1178136 | 2 |
0.008 | 2597615 | 4 |
0.010 | 236637 | 3 |
0.011 | 1086800 | 1 |
Last trade - 13.02pm 15/10/2024 (20 minute delay) ? |
Featured News
PRM (ASX) Chart |
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online