WGO 0.00% 35.5¢ warrego energy limited

Vazquez tour Insecurity Summer 2017 PETROLEUM SEARCH Discussion...

  1. 548 Posts.
    Vazquez tour Insecurity Summer 2017
    PETROLEUM SEARCH
    Discussion of the use of fracking is revived
    It is imminent to start prospecting in Salto and activists fear that it will be used.
    Vote for this news:
    fracking - for oil - Hydrocarbon prospection - Free Movement of Megaminería Uruguay
    05 Feb 2017
    Discussion fracking yes fracking does not have a new stage. The company Schupbach Energy Uruguay submitted a summary environmental report to the National Environment Directorate (Dinama) to obtain the prior environmental authorization for its project, which consists of the drilling of four on-shore exploratory wells to determine the potential existence of Hydrocarbons in the departments of Salto, Tacuarembó and Paysandú.
    The initiative has generated all sorts of fears from the people of the region who mobilized against the possibility of using the fracking technique (massive hydraulic fracturing) that allows to extend the possibilities of extraction of oil and gas to generating rocks in Its early phase. Now, while in the report the company made it clear that "the type of conventional target being explored does not require the use of this technology," the activists do not believe it and expect to present to Dinama objections to the convening of public hearings .
    One of the highlights of the speech by the mining activists is that Petrel, the 51% owner of Schupbach Energy, issued its fourth quarter report to investors and stated that it "targets conventional and non-conventional oil targets. Conventional in the concessions of Piedra Sola and Salto ".
    The conventional objectives involve the search for oil and gas that was encapsulated in dry rocks as a result of their evolution. The unconventional refer to the generator rocks at an early stage where the oil or gas has not yet migrated to those capsules. In these cases for extraction, the fracking technique is required.
    "They are hiding what they are going to do, saying that they are only looking for non-conventional," he told El País Víctor Bacchetta, a member of the Uruguayan Free Movement of Megaminería, who added that Petrel's statement also states that "the other well in Salto's permit, Panizza-1 is not only directed to a very large structure with considerable potential for oil and gas in multiple areas, but also has a large and dense section of the Devonian, possibly complete, with schist and development of the reservoir's potentially ideal " .
    According to Bacchetta "this evidence confirms our previous assumption that the drilling project contains unconventional objectives that are not admitted to the public presentations and the same environmental report" presented by the company.
    On February 14, the deadline for submitting comments to the statement made by the company before Dinama is over. Based on this, the Uruguay Free movement and activists from Tacuarembó, Paysandú and Piedra Sola will present two technical reports to Dinama, one with an Argentine expert, and another legal one criticizing that the company's document questions the departmental decision of Salto and Paysandú that "Are in force because they were not appealed," Bacchetta said. "We want to present it earlier to request that public hearings be called," he added.
    In Paysandú, Salto, Tacuarembó and Rocha, departmental decrees have been issued expressly prohibiting fracking. In the report, precisely, alludes to these decrees. "From the legal point of view, Parliament has expressed itself in relation to the unconstitutionality of enacting bans by the Departmental Boards on technologies of use in the oil sector, when issuing a resolution on a similar decree prohibiting the fracking generated by The Departmental Board of Tacuarembó ... The resolution is also protected in Judgment No. 27.193 of October 23, 2013 of the Electoral Court, which fails to result in the popular campaign of signatures campaign to request the Departmental Board Approval of a decree prohibiting open-pit metal mining in the territory of Tacuarembó, under similar legal considerations, "he says.
    PROSPECTION OF HYDROCARBONS.
    It is planned to drill 4 wells.
    The four wells to be realized will be located in Cuchilla of the Pampa, Tacuarembó, with an estimated depth in 370 meters; In Cerro Padilla, Paysandú, with 815 meters; In Cerro de Chaga (1,400 meters) and Cañada Fea (1,400 meters) in Salto. "The location of the exploratory wells is based on the results obtained through the 2D seismic realized in the Blocks Salto and Piedra Sola, that identified a set of areas of favorability of accumulation of hydrocarbons, explains the report. The company anticipated this January to be starting the activities. The project consists of different phases. First the preparation that covers the mobilization of equipment, the construction with the assembly of the installations for the perforations. Then the operation phase is the execution of the drilling and the handling of sludge, as well as the production tests in case of being a well discovering hydrocarbons. The next phase is the closure of the well and retirement of the infrastructure. The idea is to start with the Pampa Blade. In total, the company estimates that the activities will involve between three and five weeks with a 24-hour work divided by shifts for each of the drillings "with the objective being to have the four wells drilled at the time of the conclusion of the exploration contract between SEU and Ancap In May 2017, "something that is almost a fact that will not materialize.
    TODAY NEWS
    PROGNOSIS
    Inumet maintains the forecast "significant" rainfall till Monday

    LOOK AT THE PHOTOS
    CALLS
    Who it is the famous dazzled yesterday?
    SUMMER GODDESS
    Watch the photos of the hottest summer event
    THE SCANDAL FOLLOWS
    See how they stop the Celestial Duck at the exit of a note
    DAILY SPORTS
    SOUTH AMERICAN SUB 20URUGUAY
    The Five Reasons to Trust Them
    NATIONAL
    The "Pacha" Alfonso Espino did not move the left side
    PEÑAROL
    The "Cebolla" Rodriguez came
    in
    and concentrated for the match against Liverpool
    COMMENTS
    Login to comment
    Forgot your password?
    To comment on the news you must log in with the username and password chosen at time of registration.
    If you are not registered yet, you can do so by logging on to User Registration
    Do not you remember your password? you can access the User Registration and request that you ship it to your email as a reminder.
    Ecos
    HOME
    EDITORIAL OF TODAY
    An unacceptable verbal incontinence
    But the fault is also ours, because there is no government or an abstraction of "State" that makes us citizens. We have to be and exercise that quality by deciding, demanding and assuming our obligations before falling into the category of subjects.
    Hernán BonillaNo surprise
    Leonardo GuzmanResponse to Justice

    LAST MOMENT
    Inumet maintains the forecast "significant" rainfall until Monday Weather forecast instability and storms until Monday low temperature ...
    00:05
    The Uruguayan party tambourine in his second night of rhythm and color To the sound of drums, the groups wear their best costumes and colors while touring the Montmartre ...
    22:02
    Aráujo variant will not receive the IASA The same starting lineup that played in the Franzini Stadium at the premiere of the Apertura Championship, will ...
    21:51
    The party of the date Nacional and Danubio star in the most entertaining game of the second date. The striping has ...
    21:33
    With the chip Uruguayan After the hard fall in Copa Libertadores, Wanderers looking to recover in the local football when enf ...
    21:18
    THE MOST...
    + Read + Reviewed
    1 were processed with prison offender who survived fatal road crash
    2 Father of the deceased family was Argentina police and custodian of Carlotto
    3 Recovered machine 16 tons that was stolen from the port
    4 400 beached whales appeared in New Zealand
    5 It was only 65 days, not approved and just passed it to high school
    see more
    PRINT EDITION

    THE COUNTRY
    February 10, 2017
    Download pdf
    COCKY
    automotiveProperties
    jobClassifieds
    HOME HE WHO SEEKS PRINTED EDITING DIGITAL EDITING PRESS ADVERTISING DIGITAL ADVERTISING
    Zelmar Michelini 1287, CP.11100, Montevideo, Uruguay. Copyright ® EL PAIS SA 1918 - 2017

    Original Spanish text:
    Se reaviva discusión por el uso de fracking
    Contribute a better translation
 
watchlist Created with Sketch. Add WGO (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.