Mainly,
"Should a major CBM resource be discovered in the Pedirka Basin, the most likely
commercialisation option for the gas is the Eastern Australian market.
This can be accessed via the Moomba Hub
with a new 600 km pipeline as shown below.
Studies indicate the pipeline could be
economic for a throughput as modest as 30
PJ pa, which represents only 15% of gas that
will pass through the hub. Once at Moomba,
the markets in eastern Australia can be
supplied physically or with gas swaps.
A potential target market for GSG gas is the
SunState GTL Project, which is being
developed by EIR affiliate Pacific GTL. The
project is proposed to be sited in the Surat
Basin and supply diesel for the domestic
market. The project requires 70 PJ of gas
per annum and is due for commitment in
2011."
- Forums
- ASX - By Stock
- CTP
- potential pipline link from pedirka to moobma
potential pipline link from pedirka to moobma, page-2
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTP (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.8¢ |
Change
-0.001(2.04%) |
Mkt cap ! $35.52M |
Open | High | Low | Value | Volume |
4.9¢ | 4.9¢ | 4.8¢ | $47.28K | 967.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 517610 | 4.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.0¢ | 150000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 517610 | 0.048 |
1 | 100000 | 0.046 |
1 | 150000 | 0.045 |
1 | 50000 | 0.044 |
1 | 175000 | 0.042 |
Price($) | Vol. | No. |
---|---|---|
0.050 | 150000 | 1 |
0.054 | 96554 | 1 |
0.056 | 19995 | 1 |
0.058 | 172431 | 1 |
0.060 | 121300 | 3 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
CTP (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online