FMG 0.31% $25.67 fortescue ltd

Its very hard to put a dollar figure on capital intensity, as...

  1. 2,844 Posts.
    lightbulb Created with Sketch. 887
    Its very hard to put a dollar figure on capital intensity, as there are different types of projects.
    Generally 90% the cost of green hydrogen is electricity, so buying from a 3rd party reducing the project complexity.


    • Type 1 - Buy renewable electricity from 3rd party source. Capital intensity is low, just electrolysers, water and storage. Smallish plant. This is what we are doing in Norway, Queensland etc.
    • Type 2 - Build renewable electricity from solar/wind/hydro Capital intensity is high. This is the plan for South America, some of Africa.,


    Lets say each 5MW PEM is $1,000,000 or $200,000 per MW.
    Please review the table below, but I see $1.5 Billion capex for 1 Billion KG per year.

    10,000per MW electrolyser
    2

    31,000,000.00 tonnes per year
    41,000,000,000.00 Kgs per year
    555KWh per to produce 1 Kgof H2
    655,000,000,000 KWh/year
    7150,684,932 KWh/day
    86,278,539 KWh/hour
    96,279 MWh/hour
    10

    11$1,255,707,763 Electroylyser cost for 1 Mtpa of H2
    12$250,000,000 Rest of plant
    13

    14$1,505,707,763 Plant Cost


 
watchlist Created with Sketch. Add FMG (ASX) to my watchlist
(20min delay)
Last
$25.67
Change
0.080(0.31%)
Mkt cap ! $79.03B
Open High Low Value Volume
$25.64 $25.73 $25.34 $115.7M 4.525M

Buyers (Bids)

No. Vol. Price($)
1 5969 $25.66
 

Sellers (Offers)

Price($) Vol. No.
$25.68 2328 1
View Market Depth
Last trade - 16.10pm 29/04/2024 (20 minute delay) ?
Last
$25.64
  Change
0.080 ( 0.49 %)
Open High Low Volume
$25.63 $25.73 $25.35 1511172
Last updated 15.59pm 29/04/2024 ?
FMG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.