CLQ Syerston Nickel/Cobalt Mineral Resource Estimate Updated...

  1. 30,221 Posts.
    lightbulb Created with Sketch. 206
    CLQ

    Syerston Nickel/Cobalt Mineral Resource Estimate
    Updated Resource Estimate demonstrates potential for Syerston to become a leading global supplier of cathode raw materials to the lithium-ion battery industry
    Highlights
     Update to global nickel/cobalt Mineral Resource Estimate confirms approximately 700 kt of contained nickel and over 110 kt of contained cobalt, making Syerston one of Australia’s largest undeveloped nickel/cobalt resources
     Over 92% of the Updated Mineral Resource Estimate is in the Measured and Indicated categories
     Cobalt grades position Syerston to be one of the largest global suppliers of cobalt outside Africa
     Potential to fast track development with key work programmes, infrastructure and permits already in place - prior feasibility study completed; Project located adjacent to existing road and rail line; water allocation secured; EIS approved; and Development Consent for a 2.5 Mtpa operation granted
     Nickel/Cobalt Project Prefeasibility Study (PFS) to be released shortly
     The PFS will assess potential for a 1.5 - 2.5 Mtpa mining operation to produce high purity nickel sulphate and cobalt sulphate products to supply the global lithium-ion battery industry
     The Project has the potential to generate significant scandium by-product credits, opening options for a step change reduction in scandium oxide production costs
  2. This thread is closed.

    You may not reply to this discussion at this time.

 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.