Flow rates:Gas production from the Bibblewindi multilateral pilot is currently sitting at 470,000 standard cubic feet per day.Water production continues at approx. 3000 barrels per day.
MKT The ASX can overlook its Telecomm small-caps. Here’s one diversified brand with an international footprint